B.R.Goyal Infrastructure Limited IPO

Minimum Investment

Minimum Investment (Retail)Lots (min)Shares (QTY)
₹1,35,00012000

About B.R.Goyal Infrastructure Limited

Incorporated in 2005, B.R.Goyal Infrastructure Limited is engaged in the business of construction of infrastructure projects such as roads, highways, bridges and buildings.

The company has established an integrated EPC and construction business, supported by a design and engineering team and RMC unit. The RMC unit, located in Indore, has an installed capacity of 1.80 Lakh cubic meters per annum. As of September 30, 2024, the company operates with over 199 construction equipment and vehicles.

read more >

The company entered the wind energy business by installing a 1.25 MW wind power turbine in Jaisalmer, Rajasthan, commissioned in 2005.

The company has successfully executed projects across Madhya Pradesh and is currently executing road construction projects in Maharashtra, Gujarat, Mizoram, Manipur, and Uttar Pradesh after expanding operations.

Business is divided into 5 categories:

  • Engineering Procurement Construction (EPC) services: Roads and Highways,Building and other Civil Construction
  • Ready Mix Concrete (RMC) manufacturing: Ready Mixed Concrete (RMC) is produced using computer-controlled operations, ensuring minimal environmental impact in sensitive areas.
  • Wind power generation: The company owns a 1.25 MW windmill in Jaisalmer, generating revenue and units as follows: July 2024 (13.35 INR, 3.97 Lakh KWh), March 2024 (49.38 INR, 14.70 Lakh KWh), March 2023 (33.57 INR, 10.64 Lakh KWh), March 2022 (45.49 INR, 13.85 Lakh KWh).
  • Toll Collection Contract (TCC): TCC projects are spread across Madhya Pradesh, Maharashtra, Gujarat, Punjab, Haryana, Uttar Pradesh, Mizoram and Manipur.
  • Residential Plotting Projects: The company recently launched 2 residential plotting projects named as BRG Hill View – II and BRG Hill View II Extension at Village Sanawadiya, Indore.

As on September 30, 2024, the company had 402 permanent employees and 212 employees at our TCCs.

Competitive Strengths:

  • Established roads and highways sector focused construction developer
  • Efficient business model
  • Strong Order Book with growing project portfolio.
  • Technology enabled project management capabilities
  • Project management
  • Equipment ownership
  • Strong Workforce
  • Experienced management team

B.R.Goyal Infrastructure Limited IPO Details

IPO DateJanuary 7, 2025 to January 9, 2025
Face Value₹10 per share
Price Band₹128 to ₹135 per share
Lot Size1,000 Shares
Total Issue Size63,12,000 shares
(aggregating up to ₹85.21 Cr)
Fresh Issue63,12,000 shares
(aggregating up to ₹ 85.21 Cr)
Issue TypeBook Built Issue IPO
Listing AtBSE SME
Share Holding Pre Issue1,75,12,704 shares
Share Holding Post Issue2,38,24,704 shares
IPO Open DateTuesday, January 7, 2025
IPO Close DateThursday, January 9, 2025
Basis of AllotmentFriday, January 10, 2025
Initiation of RefundsMonday, January 13, 2025
Credit of Shares to DematMonday, January 13, 2025
Listing DateTuesday, January 14, 2025
Cut-off time for UPI mandate confirmation5 PM on January 9, 2025

B.R.Goyal Infrastructure Limited IPO Prospectus

B.R.Goyal Infrastructure Limited Financial Snapshot (in Lakhs)

Period Ended31 Jul 202431 Mar 202431 Mar 202331 Mar 2022
Assets26,999.8523,948.5219,725.8420,338.54
Revenue15,686.4559,619.235,329.7422,863.32
Profit After Tax194.462,188.911,733.51756.09
Net Worth12,863.4812,666.7910,479.048,746.91
Reserves and Surplus11,124.211,797.159,609.47,877.27
Total Borrowing6,411.094,947.284,163.545,340.28

B.R.Goyal Infrastructure Limited Promoters Holding

Mr. Brij Kishore Goyal, Mr. Balkrishna Goyal, Mr. Gopal Goyal, Mr. Rajendra Kumar Goyal, Mr. Yash Goyal, Mr. Uppal Goyal and M/S. B.R. Goyal Holdings Private Limited

B.R.Goyal Infrastructure Limited Contact Details

B.R.Goyal Infrastructure Limited
3-A
Agrawal Nagar,
Indore 452001,
Phone: +91-731 2403831
Email: cs@brginfra.in
Website: http://www.brginfra.com/

0
Comments are closed